Tuen mun mtr8/15/2023 ![]() ![]() Xii) Temporary platforms with loading/unloading points, flood wall and construction access along and within Tuen Mun River to facilitate construction works Xi) Re-provisioning of the existing Wu Shan Recreation Playground (including Tuen Mun Road Safety Town), Hoi Wong Road Pet Garden and MUN X) Demolition of existing Tuen Mun Swimming Pool (TMSP) after completion of the new swimming pool constructed by 1503 Contractor at the existing Tuen Mun Golf Centre Vii) Widening of Tuen Yee Street and associated public transport facilities at Area 16 Vi) Noise barriers (partial and full enclosure) on viaducts V) Intermediate emergency access point (EAP) to viaduct Iii) Viaducts and connections from existing overrun viaduct at TUM to A16 Station and from A16 Station to Tuen Mun South Station (TMS) via TRB Ii) Tuen Mun River Bridge (TRB) over Tuen Mun River ![]() I) New station at Tuen Mun Area 16 (A16 Station) extending from Tuen Mun Station (TUM) ![]() The major elements of works comprise the design and construction of: In keeping with the Corporation’s partnering approach, preference will be given to contractors who can clearly demonstrate and encourage a collaborative working approach and a shared commitment to achieving a successful project outcome. Option A: Priced contract with activity schedule Option C: Target contract with activity schedule NEC4 Engineering and Construction Contract June 2017 (with amendments October 2020) 2.1 1501, 15 will be tendered and awarded in the following types of contract and conditions of contracts: ![]()
0 Comments
Leave a Reply.AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |